首页> 外文会议>International Scientific Conference Investments, Construction, Real Estate: New Technologies and Special-Purpose Development Priorities >TheNew Angrarstroyas a project of non-primary-based integration of Russian and Chinese economies: opportunities and challenges
【24h】

TheNew Angrarstroyas a project of non-primary-based integration of Russian and Chinese economies: opportunities and challenges

机译:“新的Angrarstroy”是基于非初级整合的俄罗斯和中国经济的项目:机遇和挑战

获取原文

摘要

In the context of non-primary-based cooperation of Russia and China the innovation ProjectNew Angarstroy: Baikal-Amur metallurgical super-combine,is being considered.It was developed as a key part of the new stage of industrialization in Russia,including of large scale Trans-Siberian and Baikal-Amur railway reconstruction.The project serves as an alternative to further increasing the exploitation of forest resources in the Baikal region,creating here new environmentally harmful cellulose and chemical plants and tourist hotels on Baikal.The project assumes the development of the largest metallurgy production of national and international scale,which will includes high-quality ferrous metallurgy of the full cycle and titanium-magnesium industry.The development of the Baikal ecological territory is assumed within the framework of the Lake-Temple subproject.
机译:在俄罗斯与中国非初级合作的背景下,正在考虑创新项目“新的Angarstroy”:Baikal-Amur冶金超结合。它被制定为工业化新阶段的关键部分 俄罗斯,包括大规模的跨西伯利亚和贝凯尔 - 阿穆尔铁路重建。该项目是进一步提高贝京地区森林资源开采的替代方案,在此创造新的环保纤维素和化工厂和贝加尔的旅游酒店。 该项目承担了国家和国际规模最大的冶金生产的发展,包括全周期和钛镁业的优质黑色冶金。湖泊的框架内担保了贝加尔生态领域的发展 - 寺庙子项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号