In the article it is considered a linkage of underground services construction sequence with buildings and constructions which allows imagining development model of entire underground space. For this purpose, it is proposed to divide the whole underground services into sections with their subsequent integration into homogeneous organizational and technological groups. Each of these groups has strictly defined erection sequence parameters in time schedule of facility construction. For the purpose of unification one developed organizational and technological solutions as rational schemes for above mentioned groups-schemes of temporary underground services functions replacement permanent, schemes of laying underground services under transport routes of construction site, etc.
展开▼