首页> 外文会议>CBCME 2011;International Conference on Biotechnology, Chemical and Materials Engineering >The Stress and Displacement Analysis of the Cut-Off Wall for the Deep Overburden Dam
【24h】

The Stress and Displacement Analysis of the Cut-Off Wall for the Deep Overburden Dam

机译:深层覆盖坝截止墙的应力与位移分析

获取原文

摘要

The Duncan-Chang nonlinear constitutive model is used to carry out a three-dimensional finite element analysis of Xia Ban Di deep overburden dam with clay core. The regularities of the horizontal displacement, vertical stress and stress level for the cut-off wall are studied in this paper, and the paper provided reference for the dam stability and anti-seepage treatment of the cut-off wall with deep overburden.
机译:Duncan-Chang非线性本构模型用于通过粘土芯进行XIA Ban Di Die Dead Rembon Dam的三维有限元分析。 本文研究了截止墙的水平位移,垂直应力和应力水平的规律,本文为坝稳定性和抗渗透处理提供了深度覆盖物的切断墙。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号