首页> 外文会议>International Conference on Electric Technology and Civil Engineering >3D numerical analysis of Underground Culvert constructions on neighboring existing pile
【24h】

3D numerical analysis of Underground Culvert constructions on neighboring existing pile

机译:邻近现有桩地下涵洞结构的三维数值分析

获取原文

摘要

Underground Culvert construction always adjacent to existing pile foundation, it is an important problem how to ensure the security of the existing pile. Taking the Underground Culvert at West Ring Road of the South-North Water Transfer Project as an example, the 3D numerical simulation had been carried out and the stress deformation Law and the stability of the pile was studied. The results had shown that the Underground Culvert construction had little impact on the stress and the deformation of the pie, and working period does not endanger the viaduct's safety theoretically. The conclusions and suggestions are valuable for the engineering design and worth as references for the similar projects.
机译:地下涵洞施工总是与现有的桩基相邻,这是如何确保现有桩的安全性的重要问题。 以南北水转移项目的南部圆环道以地下涵洞为例,研究了3D数值模拟,研究了应力变形法和桩的稳定性。 结果表明,地下涵洞施工对馅饼的应力和变形影响几乎没有影响,工作时期不会理解高架桥的安全性。 结论和建议对于工程设计和价值为类似项目的参考是有价值的。

著录项

相似文献