首页> 外文会议>European Continuous Casting Conference >(ECCC-203)Design and commissioning of the new steel plant of ThyssenKrupp Authors names, affiliations and contact data
【24h】

(ECCC-203)Design and commissioning of the new steel plant of ThyssenKrupp Authors names, affiliations and contact data

机译:(ECCC-203)Thyssenkrupp作者名称,附属和联系数据的新钢铁厂的设计和调试

获取原文

摘要

Thyssenkrupp CSA built a new 5 million t green fieldsteel plant in Brazil. The presentation explains theequipment configuration, layout, and logistic conceptof the steel plant, consisting of 2 converters and2 continuous casting machines, based on the aimedproduct portfolio. In addition, the main challengesduring cold and hot commissioning of this plant andthe methodology during commissioning to ensure asafe and proper start up of the plant are beingexplained.
机译:Thyssenkrupp CSA在巴西建造了一个新的500万吨绿色野田斯斯泰州工厂。 该演示介绍了钢铁厂的设备配置,布局和物流概念,包括由2个转换器和2个连续铸造机,基于AimEdProduct产品组合。 此外,在调试期间,这种植物的寒冷和热调试的主要挑战,以确保植物的戏曲和适当启动的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号