首页> 外文会议>Society of Petroleum Engineers oilfield scale symposium >Development and Application of a Silicate Scale Inhibitor for ASP Flooding Production Scale
【24h】

Development and Application of a Silicate Scale Inhibitor for ASP Flooding Production Scale

机译:硅酸盐量抑制因子的开发与应用ASP洪水生产规模

获取原文

摘要

Three ASP (Alkaline, surfactant and polymer) flooding projects and one multicomponent foam flooding project have been carried out in Daqing Oilfield. The increases of oil recovery rates are all above 20% (OOIP). One of the major troubles that happened during the three ASP flooding projects and the multicomponent foam flooding project was silicate scale deposition in the tubings of production wells which caused frequent downhole operation failure. To prevent scale deposition in production wells, a scale inhibitor, which works well in brines of pH values as high as 12 was developed. The scale inhibitor is effective both on carbonate scale and on the mixed scale of carbonate and silicate. The scale inhibitor was tested on 6 production wells in two ASP flooding project zones. The pull-out period of the tested production wells were elongated from 1 month to 9 month during the test.
机译:大庆油田进行了三个ASP(碱性,表面活性剂和聚合物)洪水项目和一个多组分泡沫泛洪项目。 溢油率的增加均为高于20%(OOIP)。 发生在三个ASP洪水项目和多组分泡沫泛洪局期间发生的主要困难之一是生产井管中的硅酸盐量表沉积,这促成了频繁的井下运行故障。 为了防止生产井中的缩放沉积,显影,在高达12的pH值的盐水中运行良好的抑制剂。 抑制剂在碳酸盐尺度和碳酸盐和硅酸盐的混合尺寸上是有效的。 在两个ASP洪水项目区的6个生产井上测试了尺度抑制剂。 测试生产井的拉出时期从测试期间从1个月到9个月内伸长。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号