首页> 外文会议>Specialty conference waste combustion in boilers and industrial furnaces >Issues of operation during a trial burn at a wet process kiln
【24h】

Issues of operation during a trial burn at a wet process kiln

机译:在湿法窑中试用期间的操作问题

获取原文

摘要

Trial burns are a requirement under Section 40 CFR 270.22 and 270.66(g), in order to obtain a Part B Permit, yet their usefulness when applied to a cement kiln has to be questioned. The very features that make a cement kiln so good at thermal destruction, that of very high temperatures and a long residence time, and the fact that they must stay at those temperatures in order to make their product, I believe greatly diminishes, if not eliminates the need for many trial burn requirements. In addition, for many kilns, operating at conditions required of a trial burn can have a very costly consequence. A trial burn is something that I believe both the regulation agency and the HWDF industry as a whole should work to modify and better adapt to each particular industry. It needs to be done.
机译:试验烧伤是第40章第40章第270.22和270.66(g)条的要求,以获得B部分许可,但它们在应用于水泥窑时的有用性必须受到质疑。 制作水泥窑的功能非常擅长热破坏,非常高的温度和长期停留时间,以及他们必须留在那些温度下的事实,以便制造其产品,我相信如果不是消除,我相信大大减少了 需要许多试验烧伤要求。 此外,对于许多窑炉,在试验烧伤所需的条件下操作可能具有非常昂贵的后果。 试验烧伤是我相信监管机构和整个技术行业的一切都应该努力修改和更好地适应每个特定行业。 它需要完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号