Ausenco provided engineering services for a new copper concentrateexport shipping terminal being constructed at Punta Patache, Chile aspart of Teck Resources' Quebrada Blanca Fase 2 Project. The facilitiesinclude a desalination plant, which will produce freshwater for the portand mine facilities; this includes subsea pipelines for both intake andbrine disposal
展开▼
机译:Ausenco为新的铜集中体口岸运输终端提供了工程服务,智利·阿斯图尔特的Teck Resource'Quebrands Blanca Fase 2项目在Punta Patace。 该设施包括海水淡化厂,将为Portand Mine设施产生淡水; 这包括用于进气曲线处理的海底管道
展开▼