Globe Progress Pit Closure Planning

机译:地球进步坑闭合规划

获取原文

摘要

OceanaGold Corporation's (OGC) Globe Mine is undertaking site closure. Globe Pit closure activitiesto date include sealing a historic adit, rehabilitation and revegetation of benches, and design of thepit lake spillway. The Globe Lake has been forming since the pit began to flood naturally inSeptember 2015, following the end of mining operations.The Globe orebody was mined historically as part of the Globe - Progress group of undergroundgold mines. An adit was intersected by the modern opencast operation. The adit is below the finallake level, which originally connected the underground mines to the nearby Devil's Creek. The aditwas sealed to prevent unplanned discharges as the lake filled. Sealing works included a concretetunnel plug, shotcrete and use of low permeable fill adjacent to seal fractured ground. A littoral zonewas incorporated above the sealing layer at the final lake level. The potential seepage pathways aremonitored.Early Globe Lake water quality monitoring identified high arsenic (As) concentrations as a risk toclosure objectives. OGC therefore adopted an adaptive management approach, involvingmonitoring total As stored in the Globe Lake water column. At Year 3 the monitoring and forecastedAs loads triggered 'in-pit ferric dosing'. This involves addition of ferric chloride to the Globe Laketo remove As from the water column by co-precipitation/adsorption.Arsenic load in the water column has decreased by over 80% following ferric dosing, enabling directdischarge of Globe Lake water to Devils Creek without further treatment. The lake level ismaintained by a syphon discharging offsite, while the Globe Spillway is constructed. The spillwayallows for the in-perpetuity discharge of Globe Lake to Devil's Creek.
机译:Oceanagold Corporation的(OGC)Globe Mine正在进行场地关闭。 Globe Pit Closure Activitistodododododatordo包括密封历史性的Adit,康复和长凳的恢复,以及雪路湖溢洪道的设计。在采矿业务结束之后,全球湖已形成自2015年自然洪水自然洪水自然洪水。历史上,全球矿体被居住在地球上的地球进展集团的一部分。 Adit由现代Opencast运营相交。 Adit低于Finallake水平,最初将地下矿山连接到附近的魔鬼的小溪。 Aditwas密封,以防止湖泊填充的意外放电。密封工程包括混凝土插头,喷射池和使用邻近密封碎片的低可渗透填充。在最终湖泊水平的密封层上方结合在密封层上方。潜在的渗流途径荒废。地球湖水质监测将高砷(AS)浓度确定为风险的受体目标。因此,OGC采用了一种自适应管理方法,包括储存在地球湖水柱中的语调总量。 3年3日,监测和预测负载触发了“坑式菲律运因”。这涉及将氯化铁加入到Globe Laketo中,通过共沉淀/吸附从水柱中除去。在铁柱中的水柱中的载荷减少超过80%,使Globe Lake Water的直接放电凭借进一步的小溪治疗。湖泊等级由虹吸式排放的虹吸管,而全球溢洪道是建造的。溢出的流程适用于Globe Lake湖的恒星排放到魔鬼的小溪。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号