首页> 外文会议>International Conference of Young Scientists on Contemporary Problems of Materials and Constructions >Simulation of the optimal control of a reagent supply in the in-situ uranium leaching process
【24h】

Simulation of the optimal control of a reagent supply in the in-situ uranium leaching process

机译:原位铀浸出过程中试剂供应的最佳控制模拟

获取原文

摘要

This article develops an optimization task model for a physicochemical process that takes place in a mineral-bearing formation at the in-situ leaching of mineral. As a result of research, a certain hydrodynamic pressure and velocity field are obtained in a reservoir under the action network of wells, distributive reagent concentrations, mineral in a solid and liquid phase. Furthermore, according to this technique, the intensity-reagent impacts are studied on an extraction degree and mineral extraction time.
机译:本文开发了用于物理化学过程的优化任务模型,其在矿物的原位浸出中发生矿物构成。 作为研究的结果,在固体和液相中的井,分布试剂浓度,矿物的动作网络下的储存器中获得某种流体动力学和速度场。 此外,根据该技术,研究了提取程度和矿物提取时间的强度试剂撞击。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号