首页> 外文会议>International Symposium on the Application of Computers and Operations Research in the Mineral Industry >(1)SimSched Direct Block Scheduler: A new practical algorithm for the open pit mine production scheduling problem
【24h】

(1)SimSched Direct Block Scheduler: A new practical algorithm for the open pit mine production scheduling problem

机译:(1)Simsched Direct Block Scheduler:一种新的露天矿山生产调度问题的实用算法

获取原文

摘要

Current practices in open pit mine planning normally challenges mine planners and mine managers to make different decisions at different stages before achieving the generation of the best long-term production scheduling for their projects. The objective of this thesis provides an in-depth coverage of a novel open pit mine optimization framework, called SimSched Direct Block Scheduler (SimSched DBS). This software allows for a more global optimization process in mine planning, where it includes the steps of the traditional practices in its own single optimization algorithm and provides the mine production scheduling straight from the block model.
机译:露天矿山规划的现行实践通常挑战矿山规划者和矿山管理者在实现其项目的最佳长期生产计划的生成之前对不同阶段进行不同决策。 本文的目的提供了一种新颖的露天矿井优化框架的深入覆盖,称为Simsched Direct Block Scheduler(Simsched DB)。 该软件允许在矿山规划中提供更全局的优化过程,其中它包括在自己的单一优化算法中传统实践的步骤,并从块模型中直接提供矿井生产调度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号