首页> 外文会议>International PUMP Users Symposium >Seal and Bearing Failure on a Two-Stage Overhung Pump (3×6×13.5 CJA 2 Stage) - (PPT)
【24h】

Seal and Bearing Failure on a Two-Stage Overhung Pump (3×6×13.5 CJA 2 Stage) - (PPT)

机译:两级覆盖泵上的密封和轴承故障(3×6×13.5 CJA 2阶段) - (PPT)

获取原文

摘要

Problem Resolution: User realized the issue after reading about pump axial thrust and better understood what they had effected. Solution: Pump User returned the pump to the original configuration and reliability was improved. Lessons Learned: Continuing Education/pump training should be included in the maintenance/operation/reliability sections of any plant in order to achieve success. Modifications can have un-intended consequences. You should contact the OEM as necessary.
机译:问题解决方案:用户在阅读泵轴向推力并更好地了解他们所做的事情后实现了问题。 解决方案:泵用户将泵返回到原始配置,可靠性提高。 学习的经验教训:继续教育/泵培训应包括在任何工厂的维护/操作/可靠性部分中,以实现成功。 修改可能具有未预期的后果。 您应该根据需要联系OEM。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号