首页> 外文会议>EAGE Conference Exhibition;SPE Europec >Lab Investigation of Oil Swelling Elastomers for Smart Well Completions (SPE-113135)
【24h】

Lab Investigation of Oil Swelling Elastomers for Smart Well Completions (SPE-113135)

机译:LAB调查智能井完井的油膨胀弹性体(SPE-113135)

获取原文

摘要

Achieving successful zonal isolation is critical to install smart completion tools. Currently, cementing and mechanical packers are the only conventional methods used in Saudi fields to provide zonal isolation. However, these convential techniques are difficult to operate and result in reduced inner casing string diameter.Another method to provide zonal isolation for smart completion tools and to complete them in single stage is to use a rubber elastomer bonded onto a base pipe. The rubber swells in oil and provides a seal between the base pipe and the open hole. This paper will outline the step-by-step qualification testing that was carried out by SaudiAramco facilities in an attempt to improve zonal isolation for smart completions.
机译:实现成功的区域隔离对于安装智能完成工具至关重要。 目前,胶结和机械封装器是沙特领域中唯一用于提供区域隔离的常规方法。 然而,这些交流技术难以操作并导致内壳柱直径降低。另外的方法提供智能完成工具的区域隔离,并在单级中完成它们是使用粘合到基管上的橡胶弹性体。 橡胶在油中膨胀,在基管和开孔之间提供密封。 本文将概述由Saudiaramco设施进行的逐步资格测试,以便在尝试改善智能完成的区域隔离。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号