【24h】

PILED RAFTS IN GEOTECHNICAL PRACTICE - AN INTERNATIONAL PERSPECTIVE

机译:岩石实践中的堆筏 - 国际视角

获取原文

摘要

The performance of foundations that combine the high bearing capacity of rafts (mats) with the settlement reduction capability of piles is described through a summary of 24 case histories. Structures included are high-rise commercial office buildings, governmental buildings, industrial facilities and residential buildings, and subsurface conditions range from soft clay to stiff soil overlying rock. Pile types are bored, augered and driven. Since piled rafts are not commonly used in the United States, most of the case histories are from overseas. In all cases the performance of the foundations was monitored during and after construction. Particular emphasis is placed on measured settlements of the piled-raft foundations, distribution of resistance between piles and raft, and general analysis methods that were used by the designers for various geotechnical circumstances. Finally, patterns of behavior are summarized. In most cases, the piles were not designed to mobilize their full capacities under sustained loading of the foundation; therefore, under long-term loading conditions, the piles typically carried more load than the raft. This paper is the result of a study conducted by ITC-18 (Deep Foundations, Willem Van Impe, Chair) of the International Society for Soil Mechanics and Geotechnical Engineering by a subcommittee chaired by the author.
机译:通过24个案例历史的概述描述了将筏(垫子)高承载能力与桩的沉降减少能力结合起来的基础。包括的结构包括高层商业办公楼,政府建筑,工业设施和住宅建筑,以及地下条件范围从柔软的粘土到持久的土壤上覆盖岩石。堆积钻孔,延伸和驱动。由于在美国不常用的筏子,大多数情况历史都来自海外。在所有情况下,在建设期间和之后监测基础的性能。特别强调堆积筏基础的测量沉降,桩和筏之间的抵抗力分布,以及设计人员在各种岩土上使用的一般分析方法。最后,总结了行为模式。在大多数情况下,桩尚未旨在调动其在持续加载基金会下的全部能力;因此,在长期装载条件下,桩通常载有比筏更多的负载。本文是由ITC-18(深层基金会,Willem Van Impe,Chair)进行的研究,由作者主持的小组委员会国际机制和岩土工程协会的研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号