首页> 外文会议>European Conference on Soil Mechanics and Geotechnical Engineering vol.4 >Ervenice corridor - 130 m high spoil heap from clayey material - with transport infrastructure on its surface
【24h】

Ervenice corridor - 130 m high spoil heap from clayey material - with transport infrastructure on its surface

机译:折磨走廊 - 从粘土材料的130米高弃民堆 - 其表面上的运输基础设施

获取原文

摘要

The construction of the Ervenice corridor from uncompacted clayey material with average height 130 m is described in this paper. Because the new motorway, railway and river Bilina were situated on the crown of this spoil heap, problems of stability and settlement are described in more details. Special problems of double porosity and the change of character of clayey clods are discussed as well.
机译:本文描述了来自平均高度130米的未换下粘土材料的折叠走廊的结构。 由于新的高速公路,铁路和羽毛河位于这种弃油堆的冠冕上,因此更详细地描述了稳定性和结算问题。 讨论了双孔隙率的特殊问题及克莱伊包装特征的变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号