首页> 外文会议>Specialty conference on dredging and dredged material disposal >MIDDLE WATERWAY SEDIMENT REMEDIATION:A CASE STUDY
【24h】

MIDDLE WATERWAY SEDIMENT REMEDIATION:A CASE STUDY

机译:中水道沉积物修复:案例研究

获取原文

摘要

The Middle Waterway,located in Tacoma,Washington USA,is approximately 3,500 feet long and is typified by areas utilized for both waterway commerce and critical fish habitat.The Middle Waterway Action Committee (MWAC)has completed pre-remedial design,remedial options analysis,and remedial design for cleanup of the Middle Waterway.Working under the US Environmental Protection Agency(EPA)Superfund program for the Commencement Bay Nearshore/Tideflat site,the remediation plan includes dredging,thin-layer capping,and natural recovery.Approximately 85,000 cubic yards of dredged material from the navigation channel will be disposed of in a nearshore confined disposal facility(CDF)to support economic development.Due to listing of several fish species under the Endangered Species Act(ESA)as threatened or endangered,the remediation plan has been designed to support the remediation of contaminated sediments,the protection and creation of critical habitat to support salmon recovery,and waterway commerce.The successful integration of these potentially divergent objectives has been key to support by EPA,industry,resource agencies,and public interest groups.Final design plans are expected to be approved in late 2001 with the construction beginning in 2003.
机译:位于华盛顿州华盛顿州塔科马的中间水路约为3,500英尺长,是由水路商业和临界鱼类栖息地使用的区域。中间水道行动委员会(MWAC)已完成预补品设计,补救措施分析,和补救设计中间水路清理。在美国环境保护局(EPA)近岸/ Tideflat网站下的美国环境保护局(EPA)超级义务计划,修复计划包括疏浚,薄层封装和自然恢复。大约85,000立方码来自导航渠道的疏浚材料将在一个近岸限制处置设施(CDF)中处理,以支持经济发展。根据濒危物种法案(ESA)下的几种鱼类列出了威胁或濒危,修订计划已经存在旨在支持污染沉积物的修复,保护和创造关键栖息地,以支持鲑鱼恢复和水道COM Merce。这些潜在的不同目标的成功整合是EPA,行业,资源代理机构和公共利益集团支持的关键。预计2001年初的5次设计计划将在2003年开始批准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号