Since GTI sponsored the introduction of cured-in-place (CIP) liners for gas in the early 90’s, utility managers have begun to recognize and utilize CIP liners to solve some of their toughest maintenance concerns. Finding, repairing and taking steps to prevent gas leaks consume a large portion of an operator’s time and money. This paper will discuss how curedin- place liners provided several gas utilities with an attractive alternative to solving more costly or risky pipe maintenance concerns. PSE&G was experiencing an increasing rate of leaks at joints along a 1600 foot segment of 16 inch cast iron main that crossed an elegantly landscaped golf course. Conventional construction alternatives, joint repair, open-trench installation, or boring would have been expensive, disruptive, and even risky to employ along this route. CIP lining on the other hand, involved minimum excavation on the golf course, sealed all existing leaks along the main, provided protection against future joint and corrosion leaks, was most acceptable to the residents and golf course operator, and provided PSE&G with a cost-effective solution to the maintenance concern. Several utilities were dealing with a common maintenance problem, leaks on gas lines that had been installed underneath the floor slab of the residence. This situation presented a number of construction challenges for the gas crew. The inconvenience to residents and necessary destruction of personal property to either relay the service or insert the new service line were important factors when seeking a solution. With lining, there was less digging and no additional house piping required. Additionally, the job that usually took several days to complete was finished in hours with a liner. As important, the residents were not subjected to noise, dust, and inconvenience of traditional renovation activities. When PGW was notified of a major renovation project that would parallel a large segment of their 20 inch cast iron main, they had an important decision to make. Despite the reliable performance of this older large diameter main, major construction work in close proximity to the pipe could create leaks along their pipe. Additionally, the substantial restoration work that would follow would raise the cost of subsequent leak repairs dramatically. Lining the structurally sound cast iron pipe was the utility’s choice. Lining would not only seal any existing leaks, but would also eliminate the risk of potential leaks developing as the result of construction activities and provide a cost effective solution for PGW’s Operations staff.
机译:由于GTI赞助了90年代初期的燃气衬里的引入,因此公用事业管理人员已经开始认识并利用CIP衬垫来解决他们最艰难的维护问题。寻找,修理和采取措施,以防止煤气泄漏消耗一大部分操作员的时间和金钱。本文将讨论Curedin-衬里如何提供多个天然气公用事业,其中有吸引力的替代方案来解决更昂贵或风险的管道维护问题。 PSE&G正在经历沿着1600英寸铸铁主要的1600英寸铸铁主要的接头泄漏速度,越过典雅的园景高尔夫球场。传统的建筑替代品,联合修复,开放式安装或无聊将沿着这条路线采用昂贵,破坏性,甚至风险。另一方面,CIP衬里,涉及最低挖掘在高尔夫球场上,密封沿着主要泄漏,为未来的关节和腐蚀泄漏提供保护,对居民和高尔夫球场操作员最接受,并提供了PSE&G的成本 - 维护问题的有效解决方案。几个公用事业正在处理一个共同的维护问题,泄漏已经安装在住宅的地板板下面的气体管线上。这种情况为天然气船员提出了许多施工挑战。居民的不便和必要的个人财产破坏要么中继服务或插入新的服务线是寻求解决方案时的重要因素。凭借衬里,挖掘少,不需要额外的房屋管道。此外,通常花了几天完成的作业以划线的数小时完成。同样重要的是,居民不受传统改造活动的噪音,灰尘和不便。当PGW通知一个主要的装修项目时,它将平行20英寸铸铁主要部分的一部分,他们有一个重要的决定。尽管这一较旧的大直径主要的性能可靠,但靠近管道的主要施工工作可能会沿着管道产生泄漏。此外,将遵循的实质恢复工作显着提高后续泄漏维修的成本。衬里结构上铸铁管是效用的选择。衬里不仅会密封任何现有的泄漏,而且还会消除由于施工活动而发展的潜在泄漏的风险,并为PGW的运营人员提供了成本效益的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号