DEVELOPMENT AND IMPLEMENTATION OF A PERMITS MANAGEMENT DATABASE FOR A LARGE WATER CIP

机译:用于大型水CIP的许可管理数据库的开发和实施

获取原文

摘要

This paper describes the development and implementation of an innovative approach toward managing permit compliance for City of San Diego Water Department, Capital Improvements Program (CIP) projects. As the consulting Program Manager for this large infrastructure improvement program, Parsons Infrastructure and Technology Group, Inc. (Parsons) has worked closely with City staff to develop a system which enables easy tracking of environmental and construction permits. This system has been in operation for three years, hence this paper also presents a status report on its implementation. The City of San Diego has implemented a CIP to upgrade and expand their water supply system to meet immediate and long range needs. The CIP is a $773 million program, and includes over 80 projects to upgrade and expand the City’s water supply system by 2006. Water facilities to be designed and constructed under the CIP include: water treatment plant upgrades/expansions, pump plants, treated water storage facilities, potable and reclaimed water pipelines, and a new Water Operations Central Facility. The permit tracking system combines the Permit Coordinator’s knowledge of permit timing and durations with an efficient and cost effective schedule controls tool. To develop the permit module, a Microsoft Access? database was created that contains: 1) all possible CIP project permits; 2) responsible agencies; 3) key events associated with each permit; and 4) the temporal relationship of these events to a particular activity (e.g., 90 percent design stage) in the Primavera? (P3) schedule. These logic relationships and timings are carefully monitored and updated by the Permit Coordinator, who is responsible for maintaining a realistic permitting process time model for the CIP. Access? is used as the database manager and P3 as the scheduling system. Five event dates are carried in the database for each permit: start process, submit fee request, submit permit, issue
机译:本文介绍了管理许可遵守圣地亚哥水部门,资本改进计划(CIP)项目的创新方法的开发和实施。作为这一大型基础设施改善计划的咨询计划经理,帕森斯基础设施和技术集团公司(帕森斯)与城市工作人员密切合作,开发一个能够轻松跟踪环境和建筑许可的系统。该系统一直在运行三年,因此本文还提出了关于其实施的状态报告。圣地亚哥市已实施CIP,升级和扩展其供水系统,以满足立即和长期的需求。 CIP为77300万美元的计划,包括80多个项目,升级和扩大该市的供水系统到2006年。在CIP下设计和构建的水设施包括:水处理厂升级/扩展,泵厂,经过处理的储水设施,饮用品和再生水管道,以及新的水运营中央设施。许可证跟踪系统结合了许可协调员对许可证时序和持续时间的了解,具有有效和经济效益的安排控制工具。要开发许可证模块,Microsoft Access?创建数据库,其中包含:1)所有可能的CIP项目许可; 2)负责任的机构; 3)与每次许可相关的关键事件; 4)这些事件对Primavera的特定活动(例如,90%的设计阶段)的时间关系? (p3)时间表。许可协调员仔细监控和更新这些逻辑关系和定时,该逻辑协调员负责维护CIP的逼真允许处理时间模型。使用权?用作数据库管理器和P3作为调度系统。每次许可证的数据库中携带五个活动日期:开始流程,提交费用请求,提交许可证

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号