DECOMMISSIONING IS INEVITABLE: PLANNING SOONER RATHER THAN LATER CAN HAVE BIG PAYOFFS FOR NUCLEAR POWER PLANTS AND UTILITIES

机译:退役是不可避免的:规划越早,而不是后来可以为核电厂和公用事业提供大的回报

获取原文

摘要

It is inevitable that every nuclear facility must one day be retired and safely decommissioned. One of the conditions imposed by the United States Nuclear Regulatory Commission (NRC) when it issues a commercial nuclear plant-operating license is that the licensee commit to decommissioning the plant after it shuts down. Utility owners tend to postpone decommissioning decisions until after a decision is made to terminate the reactor’s operating license. This paper puts forth a concept to perform meaningful and significant decommissioning planning while the reactor is still operating as a cost reduction and decommissioning schedule improvement initiative. Justification for early decommissioning planning as well as a scope of work for the planning effort is provided. Decommissioning costs are large and often exceed the reactor’s initial construction cost. The NRC initially licenses reactors to operate for 40 years and many of these plants are nearing the end of their licensed period. For many of these plants, decommissioning is looming on the horizon. Altho ugh some utilities are applying for operating license extensions, deregulation and economic considerations could have more of an effect on life expectancies of nuclear plants than aging. Decommissioning should be considered as an integral and important part of a nuclear plant’s life cycle management. Planning for decommissioning should begin before a decision is made to shut down the reactor. Decommissioning planning, if initiated well before plant shutdown, will not only reduce the life cycle costs of the facilities, but also improve the quality of the planning effort and shorten the decommissioning schedule. Since decommissioning is a reality that faces every commercial reactor, prudent management dictates that reactor owners make decommissioning planning part of normal reactor operations and reduce the overall cost to the ratepayers.
机译:这是不可避免的,每个核设施必须有一天退休并安全退役。美国核监管委员会(NRC)施加的条件之一,当它发布商业核电站运营许可证时,被许可人在关闭后承诺退役工厂。在做出决定终止反应堆的运营许可证之后,公用事业所有者倾向于推迟退役决定。本文提出了一个概念,以执行有意义和大量的退役计划,而反应堆仍然经运作成本降低和退役时间表改进倡议。提前退役规划的理由以及规划努力的工作范围。退役费用大,往往超过反应堆的初始施工成本。 NRC最初许可牌照才能运营40年,其中许多这些植物即将结束其许可期。对于许多这些植物来说,退役正在覆盖地平线。 Altho Ugh申请了一些公用事业公司申请经营许可扩展,放松管制和经济考虑可能对核电站的预期预期产生了更多的影响而不是老化。退役应被视为核电站生命周期管理的一体化和重要部分。在决定关闭反应堆之前,应开始进行退役。退役规划,如果在工厂关闭前发起,不仅会降低设施的生命周期成本,还可以提高规划努力的质量,并缩短退役时间表。由于退役是面对每个商业反应堆的现实,谨慎管理决定了反应堆业主使普通反应堆操作的退役规划部分,并将总成本降低到率日。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号