首页> 外文会议>IEEE PES General Meeting, Conference Exposition >Incorporating post zonal reserve deployment transmission constraints into energy and ancillary service co-optimization
【24h】

Incorporating post zonal reserve deployment transmission constraints into energy and ancillary service co-optimization

机译:将邮政局储备部署传输传输限制纳入能源和辅助服务共同优化

获取原文

摘要

This paper presents a new approach implemented in MISO day-ahead and real-time Energy and Ancillary Service Market clearing processes to address the reserve deliverability issue. In this approach, MISO enhanced the co-optimization process to incorporate post zonal reserve deployment transmission constraints. Reserves are procured within the co-optimization to meet both market-wide reserve requirements and ensure their deliverability on a zonal basis. As a result, zonal Market Clearing Prices (MCPs) for reserves can properly reflect the effects of zonal reserve deployment on transmission constraints under consideration.
机译:本文提出了一种在MISO日期和实时能源和辅助服务市场清算流程中实施的新方法,以解决储备可交付性问题。 在这种方法中,MISO增强了共同优化过程,以合并临时储备部署传输约束。 在共同优化内采购储备,以满足市场范围内的储备要求,并确保其在危区上的可交付能力。 因此,储备的居民市场清算价格(MCP)可以妥善反映区间储备部署对正在考虑的传输约束的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号