...
首页> 外文期刊>IEEE Transactions on Power Systems >Incorporating Post Zonal Reserve Deployment Transmission Constraints Into Energy and Ancillary Service Co-Optimization
【24h】

Incorporating Post Zonal Reserve Deployment Transmission Constraints Into Energy and Ancillary Service Co-Optimization

机译:将分区后储区部署的传输约束纳入能源和辅助服务的共同优化中

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents a new approach implemented in MISO day-ahead and real-time energy and ancillary service market clearing processes to address the reserve deliverability issue. In this approach, MISO enhanced the co-optimization process to incorporate post zonal reserve deployment transmission constraints. Reserves are procured within the co-optimization to meet both market-wide reserve requirements and ensure their deliverability on a zonal basis. As a result, zonal market clearing prices (MCPs) for reserves can properly reflect the effects of zonal reserve deployment on transmission constraints under consideration.
机译:本文提出了一种在MISO日前和实时能源与辅助服务市场结算流程中实施的新方法,以解决储备交付性问题。在这种方法中,MISO增强了协同优化流程,以纳入分区后储备部署传输约束。在共同优化的范围内采购储备金,以满足市场范围内的储备金要求,并确保按地区交付。因此,储备金的区域市场清算价格(MCP)可以正确反映区域性储备金部署对正在考虑的输电限制的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号