首页> 外文会议>IEEE Madrid PowerTech Conference >Black Start Service from Offshore Wind Power Plant using IBESS
【24h】

Black Start Service from Offshore Wind Power Plant using IBESS

机译:使用IBESS的海上风电厂黑色开始服务

获取原文

摘要

The share of renewables in the power system is increasing rapidly. Large offshore wind power plants (OWPPs) are developed at a high pace and conventional fossil fuel-based plants are decommissioned. Consequently, there will be a risk of insufficient amount of power plants providing black start functionality for system restoration after a black out. This paper proposes a STATCOM with a battery energy storage that is located at the point of common connection to an OWPP that together can provide a reliable black start service to the power grid. The concept is demonstrated by using time domain simulations in PSCAD. The STATCOM functionality provides fast and dynamic reactive power management and the battery unit provides active power balancing capability to maintain the frequency within a tolerable range specified by the system operator. The simulation results fulfill the success criteria for the black start and confirm its feasibility for practical implementation.
机译:电力系统中可再生能源的份额正在迅速增加。 大型海上风力发电厂(OWPPS)以高速度开发,传统的化石燃料厂退役。 因此,将存在不足提供黑色开始功能的发电厂数量的风险,以便在黑色外面进行系统恢复。 本文提出了一种具有电池能量存储的Statcom,该电池能量存储位于与OWPP的公共连接点,一起可以为电网提供可靠的黑色开始服务。 通过使用PSCAD中的时域模拟来展示该概念。 Statcom功能提供快速和动态的无功功率管理,电池单元提供有效功率平衡能力,以将频率维持在系统操作员指定的可容忍范围内。 仿真结果符合黑色开始的成功标准,并确认其可行性实现实际实施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号