首页> 外文会议>IEEE Madrid PowerTech Conference >Importance of Linking Inertia and Frequency Response Procurement: The Great Britain Case
【24h】

Importance of Linking Inertia and Frequency Response Procurement: The Great Britain Case

机译:连接惯性和频率响应采购的重要性:英国案例

获取原文

摘要

In order to decarbonise the electricity sector, the future Great Britain (GB) power system will be largely dominated by non-synchronous renewables. This will cause low levels of inertia, a key parameter that could lead to frequency deterioration. Therefore, the requirement for ancillary services that contain frequency deviations will increase significantly, particularly given the increase in size of the largest possible loss with the commissioning of large nuclear plants in the near future. In this paper, an inertia-dependent Stochastic Unit Commitment (SUC) model is used to illustrate the benefits of linking inertia and frequency response provision in low-inertia systems. We demonstrate that the cost of procuring ancillary services in GB could increase by 165% if the level of inertia is not explicitly considered when procuring frequency response. These results highlight the need to re-think the structure of ancillary-services markets, which in GB are nowadays held one month ahead of delivery.
机译:为了脱碳电力部门,未来的英国(GB)电力系统将主要由非同步可再生能源主导。这将导致低水平的惯性,这是一个可能导致频率恶化的关键参数。因此,含有频率偏差的辅助服务的要求将显着增加,特别是在不久的将来,核电站调试的最大可能损失的规模增加。在本文中,使用惯性依赖随机单位承诺(SUC)模型来说明低惯性系统中链接惯性和频率响应提供的益处。我们证明,如果在采购频率响应时未明确考虑惯性水平,则GB中的辅助服务的成本可能会增加165%。这些结果突出了重新思考辅助服务市场结构的必要性,现在在发货前一个月举行了一个月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号