首页> 外文会议>IABSE (International Association for Bridge and Structutal Engineering) Symposium >New launching method of composite steel-concrete decks for replacing two bridges in Luxembourg
【24h】

New launching method of composite steel-concrete decks for replacing two bridges in Luxembourg

机译:复合钢混凝土甲板的新发射方法,用于在卢森堡代替两座桥梁

获取原文

摘要

The deck replacement of two bridges in Luxembourg is presented, using a new launching method of composite steel-concrete box-girder decks already with the slab, which comprises also the dismantling of the old decks. The main construction steps for replacing the two bridge decks with typical spans of 35 m are described. The data of the new decks and the design verifications, both during construction and in service, are presented.
机译:甲板更换卢森堡的两座桥梁,采用了已经使用板坯的复合钢 - 混凝土箱梁甲板的新发射方法,该方法也包括旧甲板的拆除。 描述了用典型的跨度为35μm的两个桥甲板的主要施工步骤。 展示了新甲板的数据和建筑和服务期间的设计验证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号