首页> 外文会议>SPE/IATMI Asia Pacific Oil and Gas Conference and Exhibition >Successful Deployment of Horizontal Openhole Gravel Pack with Alternate Path Technique and Filter-Cake Breaker Placement for Effective Well Cleanup Offshore Myanmar
【24h】

Successful Deployment of Horizontal Openhole Gravel Pack with Alternate Path Technique and Filter-Cake Breaker Placement for Effective Well Cleanup Offshore Myanmar

机译:用替代路径技术成功部署水平透露砾石包装和滤饼破碎机放置,用于近海缅甸

获取原文

摘要

The Badamyar project is an offshore gas field located 220 km south of Yangon in the Republic of the Union of Myanmar. In February 2017, four gas wells were successfully drilled and completed using horizontal openhole gravel packing in the Badamyar gas field. The downhole completion design adopted was an alternate path technique using filter-cake breaker deployment for effective well cleanup. Initial geomechanical studies performed in the field show that the sands have low mechanical strength; consequently, they are unconsolidated. This was verified with sonic measurement of 120 us/ft (more than 110 us/ft). An active sand control technique was deemed necessary to ensure a robust well completion with longevity for expected gas production. Based on the comparative risk analysis conducted by the operator for various types of sand control and reservoir drainage, a horizontal openhole gravel pack method was selected to complete the four wells. During the well planning stage, the following specific challenges were identified for the installation of the lower completion: 1. Openhole gravel placement method; alpha/beta wave vs. alternate path technique considering low fracture gradient to achieve 100% pack efficiency; 2. Efficient gravel pack carrier fluid for the selected method; 3. Expected long drain hole in a clay sensitive environment; 4. Effective filter-cake cleanup post-gravel pack; 5. Very fine, poorly consolidated, and immature shaly sands. Downhole sand control equipment deployment, gravel pack placement, filter-cake removal, and initial production results have proven the selected gravel pack method to be successful in the Badamyar field. This paper presents the measures taken to address the project challenges during the design and execution phase and the results achieved. The success achieved can be adopted for the completion of high-rate gas wells with similar reservoir conditions in this area and beyond.
机译:Badamyar Project是一座海上天然气田,位于缅甸联盟以南仰光以南220公里。 2017年2月,使用Badamyar Gas Field中的水平透露砾石包装成功钻探并完成了四种气井。采用的井下完井设计是使用滤饼断路器部署的替代路径技术,以进行有效良好的清理。在该领域进行的初始地质力学研究表明,沙子机械强度低;因此,它们是未溶解的。通过Sonic测量为120 US / FT(超过110美元/英尺)来验证这一点。认为有必要采用活性的砂控制技术,以确保具有寿命的寿命,为预期的天然气生产。根据操作员对各种类型的砂控制和储层排水的比较风险分析,选择水平露出砾石包方法来完成四个孔。在井规划阶段,确定了以下完成的具体挑战:露井砾石放置方法; alpha / beta波与替代路径技术考虑低骨折梯度以实现100%的包装效率; 2.用于所选方法的高效砾石包装载体载体; 3.粘土敏感环境中的预期长排孔; 4.有效的滤饼清洁后砾石包装; 5.非常精细,巩固不良,肤色不成熟的沙子。井下砂控制设备部署,砾石包装放置,滤饼去除,初始生产结果已经证明了选定的砾石包方法在Badamyar领域成功。本文介绍了在设计和执行阶段解决项目挑战的措施,并取得了成果。可以采用在该地区及其他地区具有类似的储层条件的高速储气井完成的成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号