首页> 外文会议>SPE/IATMI Asia Pacific Oil and Gas Conference and Exhibition >New Perspective to Unlock Opportunities in Mature Field: Sanga-Sanga Block, Indonesia
【24h】

New Perspective to Unlock Opportunities in Mature Field: Sanga-Sanga Block, Indonesia

机译:解锁成熟领域机会的新视角:印度尼西亚桑达萨兰加街区

获取原文

摘要

Sanga-Sanga Block is located onshore of the Mahakam delta, in East Kalimantan Indonesia and operated under Pertamina Hulu Sanga-Sanga. Nilam field, one of assets in Sanga-Sanga Block was discovered in 1974 with 75 km length. Nilam field was interpreted as the extension of Badak Handil Anticline Structure. The first well, NLM 1 was spudded on 8 July 1974 and put on production 9 years later due to waiting on surface facility. Early production was 22 MMscfd and flow directly to Bontang. At present, Nilam has reached a mature stage of its life where 364 wells drilled. The productions are continuing declining and currently 98 wells online and deliver approximately 23 MMscfd and 1800 BOPD. There are 3 components to generate the production; they are base, rigless and new well program. New well program is main contributor to Nilam production. However, since oil price start to drop in 2014, drilling activity becomes decreased and consequently, rigless activity become the main backbone to arrest production decline. Aggressive rigless program is required to maintain Nilam production. Since 2010, total of perforated zones are 1323 and by the time, thus remaining zone candidates for rigless are decreasing. To face this challenge, integrated subsurface review has been conducted to assess several strategies to create new opportunity in delivering Nilam production. The strategies are; unlocking the hidden potential from by passed and unprognosed zones in existing well and campaign of complex rigless program to access the potential zones. In early 2018, these strategies has already applied and already contributed 4.42 Bcf and 164 thousands of barrel oil to Nilam Field. The success ratio is 73%. It helped to sustain Nilam production and maintain the decline rate. In summary, these strategies have successfully unlocking hydrocarbon potential and maximizing recoverable reserve in existing wells which resulted in extend the field life. This paper will describe the success story to unlock gas and oil reserve in complex environment especially at Nilam Field.
机译:Sanga-Sanga Block位于Mahakam Delta的陆上,位于东加里曼丹印度尼西亚,在Pertamina Hulu Sanga-Sanga下运营。尼尔姆领域是Sanga-Sanga块的资产之一,于1974年发现,长75公里。尼尔姆领域被解释为Badak Handlilitline结构的延伸。第一个井,1974年7月8日,NLM 1被淘汰,由于等待表面设施,9年后提出了生产。早期生产是22 MMSCFD并直接流入Bontang。目前,尼尔姆已经达到了其生命的成熟阶段,其中364孔钻井。该制作持续下降,目前在线98孔,并提供约23毫升和1800名BoPD。有3个组件可以产生生产;它们是基地,严格和新的井计划。新井计划是尼尔姆生产的主要贡献者。然而,由于2014年的油价开始下降,因此钻井活动变得下降,因此,严格的活动成为逮捕产量下降的主要骨干。侵略性的严格计划需要维持尼尔姆生产。自2010年以来,穿孔区域的总数为1323,而且当时,严格的剩余区候选人正在减少。要面对这一挑战,已经进行了综合的地下审查,以评估若干策略,以创造尼利姆生产的新机会。策略是;通过在现有的井中通过传递和未达到的区域解锁隐藏的潜力以及复杂的严格程序的广告系列来访问潜在区域。 2018年初,这些策略已经申请并已经贡献了4.42个BCF和164人桶油到尼尔姆领域。成功比率为73%。它有助于维持尼尔姆生产并保持下降率。总之,这些策略成功地解锁了现有井中的碳氢化合物潜力和最大化可收回的储备,导致展开场寿命。本文将描述在尼尔姆领域的复杂环境中解锁天然气和石油储量的成功故事。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号