首页> 外文会议>SPE/IATMI Asia Pacific Oil and Gas Conference and Exhibition >Drilling and Well Intervention Contract Strategy during Operatorship Transition: Practicing in Mahakam Block, Sanga Sanga Block, and East Kalimantan-Attaka Block
【24h】

Drilling and Well Intervention Contract Strategy during Operatorship Transition: Practicing in Mahakam Block, Sanga Sanga Block, and East Kalimantan-Attaka Block

机译:运营经营过程中的钻井和井干预合同战略:在Mahakam Block,Sanga Sanga Block和East Kalimantan-Attaka Block中练习

获取原文

摘要

PT Pertamina Hulu Indonesia ("PHI") was founded in December 28th, 2015 as a subsidiary of PT Pertamina (Persero) ("Pertamina"). PHI was established as operation holding company to operate, manage, and conduct upstream activities in working areas, which were handed over to Pertamina by Government of Indonesia ("GoI"). The corporate objectives of PHI are to maintain production, to increase reserves, to conduct exploration activities and to assist/provide guidance in terms of HSSE policies of the working area. Recently, PHI has three subsidiaries: PT Pertamina Hulu Mahakam ("PHM"), PT Pertamina Hulu Sanga Sanga ("PHSS"), and PT Pertamina Hulu East Kalimantan ("PHKT"). Each subsidiary requires many approaches to restrain high natural declined rate related to drilling, workover, and well services activities. Consequently, Pertamina as the new Operator had to immediately conduct such activities even prior to effective date of its operatorship. Pertamina has invested in PHI through its first subsidiary since 2017 through drilling 15 wells, 12 workover, and hundred of well services activities. In addition, 7 new Plan of Development(s) ("POD"s) have been agreed for 180 new drilling jobs in 2018 onwards to support production target. Meanwhile for other subsidiaries, Pertamina immediately conducted upstream activities consist of 2 new drilling jobs, 9 workover & 70 well services for its second subsidiary, and 10 workover & 59 well services for its third subsidiary, right after the blocks were handed over. To ensure drilling and well intervention activities conducted properly, many material and services contracts must be prepared and available on time prior to program started, such as Drilling Rig Services, Drilling Fluid Services, Cementing Services, Electric Logging Services, Wellhead Services, Coiled Tubing Unit Services, et cetera. It has to be started from the beginning of and completed within the transition period. However, throughout transition period, PHI was dealing with some concerns due to many parties involved, especially regarding information restriction and confidentiality included into legal issue. In addition, PHI had also limited time and drilling personnel resources to prepare the contracts required to execute drilling and well intervention program. To encounter challenges above, the first thing to be prepared was Transfer Agreement ("TA"), and both parties (PHI and former Operator) to align rights and responsibilities of each party must sign it. PHI was succesfull in providing all required contracts for the continuation of transition and operation activities at PHI subsidiaries. Over the transition period, PHI already providing the procurement contracts directly related to drilling and well intervention activities, as follows: 158 contracts from former Operators and 60 new procurements for the new Operators. This paper will describe the successful contract strategy implementation of three subsidiaries in PHI which proven to be an efficient example of working area transition period in term of contracts.
机译:PT Pertamina Hulu印度尼西亚(“PHI”)于2015年12月28日成立,作为PT Pertamina(Persero)(“Pertamina”)的子公司。 PHI被建立为运营公司,在印度尼西亚政府(“GOI”)中交给Pertamina的工作领域的运营,管理和开展上游活动。 PHI的企业目标是维持生产,增加储备,开展勘探活动,并协助/在工作区的HSSE政策方面提供指导。最近,PHI有三个子公司:PT Pertamina Hulu Mahakam(“PHM”),PT Pertamina Hulu Sanga Sanga(“PHSS”),以及PT Pertamina Hulu East Kalimantan(“PHKT”)。每个子公司都需要许多方法来限制与钻井,工作组和井服务活动相关的高自然拒绝率。因此,佩蒂亚那作为新的运营商必须立即在其经营者的生效日期之前立即进行此类活动。自2017年以来,Pertamina通过其第一家子公司投资了PHI,通过钻出15个井,12个工作组和百家井服务活动。此外,2018年向2018年开始提供180项新的钻井就业机会,以支持生产目标的7个新的开发计划(“Pod”)。与此同时,对于其他子公司,Pertamina立即进行上游活动,包括2个新的钻井就业机会,9个工作组和70个井服务,为其第二个子公司和第三个子公司提供的10个工作组和59个好的服务,之后延伸后的第三个子公司。为确保钻井和井干预活动正确进行,必须准备好的材料和服务合同,并在计划开始之前准备,如钻井钻机服务,钻井液服务,胶合服务,电动测井服务,井口服务,卷材管道单元服务,等等。它必须从过渡期内从开始并完成。但是,在整个过渡期间,PHI由于所涉及的许多方而言,尤其是关于法律问题的信息限制和机密性。此外,PHI还有限时和钻探人员资源,以准备执行钻井和井干预计划所需的合同。为了遇到上述挑战,首先要准备的是转让协议(“TA”),双方(PHI和前运营商)对准每个方的权利和责任必须签署。 PHI是成功的,为在PHI子公司继续过渡和运营活动的情况下提供所有必要的合同。在过渡期间,PHI已经提供与钻井和井干预活动直接相关的采购合同,如下:前运营商的158个合同和新运营商的60个新采购。本文将描述PHI中三个子公司的成功合同战略执行,该职位已被证明是合同期限的工作区过渡期的有效举例。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号