首页> 外文会议>IFIP WG 5.7 International Conference on Advances in Production Management Systems >Cross-Functional Coordination Before and After the CODP: An Empirical Study in the Machinery Industry
【24h】

Cross-Functional Coordination Before and After the CODP: An Empirical Study in the Machinery Industry

机译:CODP之前和之后的交叉功能协调:机械工业的实证研究

获取原文

摘要

Cross-functional coordination among engineering, sales and production departments is known to be beneficial for improving order fulfillment processes. In Engineer-to-Order (ETO) companies, sales, design and production activities are strongly interrelated and sometimes they overlap, thus requiring cross-functional coordination. In these companies, design and production activities can be both partially performed before the customer order arrival. ETO companies pursue different objectives and implement different managerial approaches before and after the customer order decoupling point (CODP). However, despite its relevance for company performance, how ETO companies manage cross-functional coordination and how departments are coordinated before and after the CODP is still understudied. This paper sheds light on this topic by investigating 12 case studies in the Italian machinery industry. Results suggest that the coordination mechanisms used before and after CODP are different, and vary depending on the CODP configuration chosen.
机译:众所周知,工程,销售和生产部门之间的交叉功能协调有利于改善订单履行过程。在工程师(ETO)的公司中,销售,设计和生产活动都是强烈的相互关联的,有时它们重叠,因此需要交叉功能协调。在这些公司中,在客户订单到达之前,设计和生产活动都可以部分地进行。 ETO公司在客户订单解耦点(CODP)之前和之后,追求不同的目标并实施不同的管理方法。但是,尽管有其对公司绩效的相关性,但埃托公司如何管理跨职能协调以及部门在仍然会被解释之前和之后协调部门。本文通过调查意大利机械行业的12个案例研究,阐明了这一主题。结果表明,CODP之前和之后使用的协调机制不同,并且根据所选的CODP配置而变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号