首页> 外文会议>PEERS/IBBC Virtual Conference >FEL1 and 2 - The Beginnings of Successful Paper Machine Conversions
【24h】

FEL1 and 2 - The Beginnings of Successful Paper Machine Conversions

机译:FEL1和2 - 成功造纸机转换的开始

获取原文

摘要

Paper machine conversion projects to alter the machines' major product grades continue to be a prevailing trend in the paper industry. In recent years, the major pulp and paper companies and the professional service firms that provide consulting and engineering to them have adopted a Front-end Loading (FEL) project engineering process similar to other process industries. Effective use of the FEL process can guide companies methodically and consistently to optimize the use of capital project funds. This paper reviews the initial phases of successful paper machine conversion engineering efforts. These phases, the FEL1 and FEL2, are often referred to as the Feasibility Analyses and Conceptual Design phases of the project. An overview of the FEL process and its deliverables, with examples pertaining to converting papermaking operations from producing one grade to another are presented. While others have presented the overall FEL concept to the industry, this paper focuses on the important initial phases where the business case is made, and major technical options are explored and narrowed. Considerations that are particular to paper machine conversions, as well as project approach and stage deliverables are documented. Major sections include: 1. Introduction - including an overview of recent machine conversions and a brief review of phased engineering processes 2. Safety and confidentiality - engagement of paper machine suppliers and others 3. Feasibility phase team selection and process approach with specific examples pertaining to paper machine conversions 4. Feasibility phase deliverables including studies, project definition, risk summary, project milestones, and order-of-magnitude total construction cost estimate 5. Conceptual Phase process approach including technical options and considerations involved in machine conversions 6. Conceptual phase deliverables including design basis, studies, technology comparisons and recommendations, drawings and documentation, project schedule, project scope, and preliminary cost estimate 7. Summary and machine conversion project path-forward.
机译:造纸机转换项目改变机器的主要产品成绩继续成为造纸行业的普遍趋势。近年来,主要的纸浆和造纸公司和为他们提供咨询和工程的专业服务公司采用了类似于其他工艺行业的前端装载(FEL)项目工程过程。有效地利用FEL过程可以指导公司有条不紊地,一致地优化资本项目资金的使用。本文审查了成功造纸机转换工程努力的初始阶段。这些阶段,FEL1和FEL2通常被称为项目的可行性分析和概念设计阶段。提出了与其可交付成果的概述,并提出了与将造纸操作转换为另一种等级的实例。虽然其他人向业界展示了整体竞技概念,但本文重点介绍了商业案例的重要阶段,并探讨了主要技术选择。记录了造纸机转换的考虑,以及项目方法和阶段可交付成果。主要部分包括:1。简介 - 包括近期机器转换的概述以及对分阶段工程流程的简要审查2.安全性和保密性 - 造纸机供应商和其他人的参与3.可行性阶段团队选择和流程与有关的具体例子造纸机转换4.可行性相位可交付成果包括研究,项目定义,风险摘要,项目里程碑和数量级总建筑成本估算。概念相位过程方法,包括技术选择和机器转换中的考虑因素6.概念相位可交换包括设计基础,研究,技术比较和建议,图纸和文档,项目时间表,项目范围和初步成本估算7.摘要和机器转换项目路径前进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号