首页> 外文会议>AEE World Energy Conference and Expo >Performance Evaluation of the 600kW Grid- Tied Solar Photovoltaic System in Strathmore University
【24h】

Performance Evaluation of the 600kW Grid- Tied Solar Photovoltaic System in Strathmore University

机译:600KW网络奔跑大学太阳能光伏系统的绩效评价

获取原文

摘要

This paper presents the performance of a 600kW a grid-tied system installed at Strathmore University.The plant has two systems,a 420kW and 180kW connected to two independent transformers.The system is composed of 2,400 solar panels and 30 inverters.The solar PV modules are spread over the rooftops of six buildings within the university.Of the 600kW,20kW has been taken away for a hybrid system that is used for training at the Strathmore Energy Research Center(SERC).The daily energy generation data for three years is used to identify the Performance Ratio(PR)and Capacity Utilization Factor(CUF)of the 600kW system.The performance analysis is then compared to a range of PR and CUF values for well performing grid- tied plants.
机译:本文介绍了在斯特拉斯莫尔大学安装的600kW一个网格绑定系统的性能。工厂有两个系统,420kW和180kW连接到两个独立的变压器。该系统由2,400个太阳能电池板和30个逆变器组成。太阳能光伏模块组成。太阳能光伏模块组成。太阳能光伏模块 在大学内的六个建筑物的屋顶上传播。600kW,20kW已被带走用于在Strachmore Energy Research Center(SERC)培训的混合系统。使用三年的日常能源生成数据 确定600kW系统的绩效比(PR)和产能利用因子(CUF)。然后将性能分析与一系列PR和CUF值进行比较,以便进行良好的流动植物。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号