首页> 外文会议>Water Environment Federation Technical Exhibition and Conference >Widening and underground bonding of shields using the largest scale freezing method in Japan for sewer construction
【24h】

Widening and underground bonding of shields using the largest scale freezing method in Japan for sewer construction

机译:使用日本最大规模的冻结法进行下水道施工时,对护盾进行加宽和地下粘合

获取原文

摘要

The Senju District of Adachi Ward, Tokyo have been experienced flood caused by heavy rain frequent in recent years, as well as shortage of rainwater drainage capacity related to the increasing rainwater inflows to the sewers according to the rapid urbanization. Additionally, pump facilities constructed in the 1940s through 1960s have aged considerably. For these reasons, the Tokyo Metropolitan Government is proceeding in the Sumidagawa Sewer Trunk Line project which erect new rainwater trunk line and new pumping station to reduce flood damage, as well as to let us reconstruct the aged pumping stations.The Sumidagawa Sewer Trunk Line is T-shaped. In this construction project, ground freezing was used as an auxiliary method to widen the shield tunnel underground to connect large trunk sewers of 6.5-meter external diameter to existing smaller trunk sewers of 5.5-meter external diameter. The amount of ground freezing was 3,700 m~3 and this was the largest-scale freezing project in the history of Japanese sewerage construction.This paper describes the project's characteristics, including the process of freezing soil, the removal of pre-existing segments, the excavating of frozen soil, and the assembly of widening segments. It also reports on simulations and other initiatives conducted to achieve safe, efficient construction, and the use of Construction Information Modeling/Management, CIM.
机译:东京Adachi Ward的Senju区近年来频繁遭遇暴雨造成的洪水,以及由于快速城市化导致雨水流入下水道而导致的雨水排水能力不足。此外,20世纪40年代至60年代建造的水泵设施已经相当老化。出于这些原因,东京都政府正在进行Sumidagawa污水干管项目,该项目修建了新的雨水干管和新的泵站,以减少洪水的破坏,并让我们重建旧的泵站。Sumidagawa污水干管为T形。在本建设项目中,采用地面冻结作为辅助方法,拓宽地下盾构隧道,将外径为6.5米的大型污水干管连接到现有外径为5.5米的小型污水干管。地面冻结量为3700 m~3,这是日本下水道建设史上规模最大的冻结工程。本文介绍了该项目的特点,包括冻结土壤的过程、现有路段的拆除、冻土的开挖和加宽路段的组装。它还报告了为实现安全、高效施工而进行的模拟和其他举措,以及施工信息建模/管理CIM的使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号