首页> 外文会议>International Conference on Bridges in Danube Basin >Centenary Traian Bridge of Timisoara, rehabilitated and neglected
【24h】

Centenary Traian Bridge of Timisoara, rehabilitated and neglected

机译:蒂米什瓦拉百年三套桥,康复和忽视

获取原文

摘要

Over the time period 2002-2010 many of the bridges crossing the Bega Channel in Timisoara city were rehabilitated. The analyzed bridge, the Traian Bridge, is approximately 100 years old and is realized out of reinforced concrete as Gerber solution. The works had different complexity degrees depending on the degradation level of the crossing structure and of its age. The bridge assures a gauge which includes a combined traffic, vehicles and tram. This particularity required specific rehabilitation solutions. In order to bring the crossing structure to an appropriate viability level, structural rehabilitation works and an anticorrosive protection of the concrete elements were executed, but also new solutions for the execution of the footway and the tram railway were adopted. The paper analysis the behaviour in exploitation of the rehabilitated elements and of the adopted technical solutions for the above mentioned structure.
机译:在2002-2010期间,许多跨越蒂米什拉城市波涛渠道的许多桥梁都被恢复了。分析的桥梁是TRAIAN桥,大约100岁,并用钢筋混凝土实现为GERBER解决方案。根据交叉结构的降级水平和其年龄,作品具有不同的复杂性度。桥梁确保仪表,包括组合的交通,车辆和电车。这种特殊性需要特定的康复解决方案。为了使交叉结构达到适当的存活水平,执行结构康复工​​作以及对混凝土元件的防腐蚀保护,还采用了执行脚道和电车铁路的新解决方案。本文分析了康复元素利用的行为及上述结构采用的技术解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号