Strategic Network Planning of Recycling of Photovoltaic Modules

机译:光伏模块再循环的战略网络规划

获取原文

摘要

Due to high subsidies, the installed capacity of photovoltaic (PV) in Germany steeply increased in the last years. Considering an expected lifetime of 20-25 years the related amount of PV waste will increase during the next decades. Thus, PV modules have been integrated into the WEEE directive in 2012. In order to fulfil the WEEE recycling and recovery quotas, it will be sufficient to recover the raw materials with the highest mass, i.e. glass and aluminium. However, with new technologies under development, it will be possible to recover also other rare strategic materials with limited availability in Germany, like silver, copper or indium. Against this background, the aim is to develop a strategic planning approach to analyse the early installation of appropriate collection and recycling infrastructures with the focus on resource criticalities. In order to do so, a multi-period MILP is developed regarding capacity, technology and location decisions for collection and recycling facilities of PV modules. Decisions are evaluated with regard to economic aspects. Additionally, information on resource criticalities derived from criticality indicators are integrated. A case study illustrates the approach and its results.
机译:由于高补贴,德国光伏(PV)的装机容量在过去几年中急剧增加。考虑到预期的寿命为20-25岁,在未来几十年中,PV废物的相关数量将增加。因此,PV模块已在2012年集成到WEEE指令中。为了满足WEEE回收和恢复配额,可以将具有最高质量的原材料,即玻璃和铝。然而,通过开发的新技术,还可以在德国的可用性有限,如白银,铜或铟的情况下恢复其他罕见的战略材料。在此背景下,目的是制定战略规划方法,分析适当收集和回收基础设施的早期安装,重点是资源关键性。为此,有关PV模块的收集和回收设施的能力,技术和地点决策,开发了多型MILP。在经济方面评估决定。此外,还集成了有关源自关键性指标的资源关键性的信息。案例研究说明了方法及其结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号