首页> 外文会议>International Symposium on Engineering and Earth Sciences >Scaling Prevention on Wells of Tarasovskoe Field
【24h】

Scaling Prevention on Wells of Tarasovskoe Field

机译:塔拉诺夫斯科乌井井的缩放预防

获取原文

摘要

Tarasovskoe oil and gas condensate field is located in the Purovskii district of the Yamal-Nenets Autonomous District of the Tyumen Region, 55 km north of Tarko-Sale town and 45 km east of Gubkinskii town. One of the main drawbacks of the existing field development system is a large stock of non-operating wells. The utilization rate of the production well stock at the field is 0.71, the rate of the injection well stock - 0.64, which leads to an oil production decline, and, resulted in deformation of the developed system, prolonged underutilization leads to significant losses in the ORI value. The main task is the struggle with scaling. At the Tarasovskoe field, the most urgent task is to reduce the risks of scaling, optimize the technologies used, and select priorities in the use of the latest technologies for the prevention of scaling. The main source of salt extraction is water extracted together with oil. The scaling process is directly connected with a significant oversaturation of the aqueous medium with difficultly soluble salts due to changes in the physicochemical parameters of the oil production system (temperature, pressure, gas evolution, concentration of precipitating ions, etc.). The chemical composition of production waters as oil reserves are constantly changing, which causes the diversity and time variability of the salt deposits composition. Forced fluid withdrawal, which is associated with the deepening and temperature increase in the ESP zone, lowering the bottomhole pressure and intensive degassing of well fluids, affects the intensity of salt deposition at different sites from bottom to bottom of the well, at submersible borehole pumps. In addition, the deposition of salts in the bottomhole formation zone leads to an increase in the skin factor, and therefore becomes a reason for the decrease in oil production in production wells. In this regard, the choice of optimal options for the prevention of scaling, taking into account the features of the operation of wells in specific fields, is extremely important for effective oil production.
机译:Tarasovskoe石油和天然气冷凝水场位于秋田山脉自治区的Purovskii区,北北售镇55公里处,距离Gubkinskii镇以东45公里处。现有现场开发系统的主要缺点之一是一股大型非操作井。在该领域的生产井股票的利用率为0.71,注入井股票的速度 - 0.64,这导致石油产量下降,并导致开发的系统的变形,延长使用不足导致了显著损失ori价值。主要任务是缩放的斗争。在Tar​​asovskoe领域,最紧急的任务是降低缩放的风险,优化所用技术,并选择使用最新技术的优先级,以防止缩放。盐萃取的主要来源是用油提取的水。缩放处理直接与难溶性盐的水介质的一个显著过饱和连接由于在石油生产系统(温度,压力,气体逸出,结果沉淀出的离子的浓度等)的物理化学参数的变化。作为石油储备的生产水域的化学成分始终变化,这导致盐沉积物组成的多样性和时间可变性。强制流体取出,与ESP区的深化和温度升高相关,降低井流量和井流体的密集脱气,影响井下井下井筒底部到底部的不同部位的盐沉积强度。此外,底孔形成区中的盐沉积导致皮肤因子的增加,因此成为生产井中油生产减少的原因。在这方面,考虑到在特定领域的井中运行的特征,选择了预防缩放的最佳选择,对有效的石油生产非常重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号