首页> 外文会议>Rock Dynamics Summit >Predicting seismic velocity distribution in the ground ahead of tunnel face using drilling vibration of hydraulic rock drill
【24h】

Predicting seismic velocity distribution in the ground ahead of tunnel face using drilling vibration of hydraulic rock drill

机译:利用液压钻钻振动预测隧道面前面的地震速度分布

获取原文

摘要

Accurate prediction of the geological conditions ahead of the tunnel face is essential for safe and economical tunnel construction. As an application of the drill logging, a new method for predicting the distribution of seismic velocity ahead of the tunnel face has been developed. The method makes it possible to determine the travel-time from transmission to reception by determining the transmission time at which the rock is hit by the drill bit and processing the wave form of the vibration received by the receivers on the tunnel face. Field test results have shown that the newly developed method is useful in predicting the seismic wave velocity distribution ahead of the tunnel face.
机译:精确预测隧道面前的地质条件对于安全和经济的隧道建设是必不可少的。作为钻井测井的应用,已经开发出一种预测隧道面前面的地震速度分布的新方法。该方法使得可以通过确定钻头击中岩石击中的传输时间并处理由隧道面上的接收器接收的振动的波形来确定从传输到接收的行进时间。现场测试结果表明,新开发的方法可用于预测隧道面前的地震波速度分布。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号