首页> 外文会议>International Conference Transport and Storage of Hydrocarbons >Methodology for reducing energy and resource costs in construction of trenchless crossover of pipelines
【24h】

Methodology for reducing energy and resource costs in construction of trenchless crossover of pipelines

机译:减少能源和资源成本在施工挖掘机桥梁的能源和资源成本的方法

获取原文

摘要

The paper suggests a set of measures to select the equipment and its components in order to reduce energy costs in the process of pulling the pipeline into the well in the constructing the trenchless pipeline crossings of various materials using horizontal directional drilling technology. A methodology for reducing energy costs has been developed by regulating the operation modes of equipment during the process of pulling the working pipeline into a drilled and pre-expanded well. Since the power of the drilling rig is the most important criterion in the selection of equipment for the construction of a trenchless crossover, an algorithm is proposed for calculating the required capacity of the rig when operating in different modes in the process of pulling the pipeline into the well.
机译:本文提出了一套措施来选择设备及其组件,以便在使用水平定向钻井技术构建各种材料的挖掘管道交叉的过程中将管道拉到井中的过程中的能量成本。 通过在将工作管道拉入钻孔和预膨胀的过程中,通过调节设备的操作模式来开发用于降低能量成本的方法。 由于钻机的功率是选择用于构造挖沟交叉的设备中最重要的标准,所以提出了一种算法,用于计算在将管道拉入的过程中以不同模式操作时钻机的所需容量 井。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号