首页> 外文会议>Complex Orebodies Conference >Optimised drill targeting using dynamic 3D modelling, Martabe Gold Mine, Indonesia
【24h】

Optimised drill targeting using dynamic 3D modelling, Martabe Gold Mine, Indonesia

机译:使用动态3D建模,Martabe Gold Lim,印度尼西亚的优化钻井瞄准

获取原文

摘要

As a project moves through the mine life cycle, the quantity of data available increases and the understanding of the orebody matures. Incorporating new information quickly and efficiently in current 3D models, is essential for adding value across the life-of-mine value chain. At the Martabe Gold Mine, the resource development group manages 14 drill rigs on 6 resource projects, including 3 operating mines. The Martabe deposits are geologically complex and the volume of new information that becomes available each day is substantial. It is imperative that new geological and assay information is integrated into the 3D models as soon as possible, so that drill planning and targeting can be modified accordingly. Martabe uses Leapfrog? 3D software to update and interrogate the 3D models on a dynamic basis as data becomes available. This results in faster and more effective changes to drill planning and schedules. The impact of this is better drill productivity and cost savings due to optimal drill targeting, and availability of up-to-date models incorporating the most current data.
机译:随着项目通过矿山生命周期移动,可用数据量的增加和对矿体成熟的理解。在当前3D模型中快速有效地整合新信息,对于增加矿山寿命价值链的价值至关重要。在Martabe Gold Lime,资源开发集团在6个资源项目上管理14个钻机,包括3个运营矿山。 Martabe沉积物是地质学复杂的,每天可用的新信息的数量很大。必须尽快将新的地质和测定信息集成到3D模型中,因此可以相应地修改钻规划和靶向。 Martabe使用LeapFrog? 3D软件以动态的基础更新和询问3D模型,因为数据变为可用。这导致钻取规划和时间表更快和更有效地改变。由于最佳钻头定位,这对这方面的影响是更好的钻取生产率和成本节约,以及包含最新数据的最新模型的可用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号