WATER SEEPING THROUGH BORED PILES IN DEEP EXCAVATION PROJECT IN BANGKOK

机译:曼谷深挖项目中渗透堆积的水

获取原文

摘要

This paper presents a case report of water seepage through deep bored piles during construction of deep basement of thehigh-rise hotel project in Bangkok. Bottom-up method of construction was used with diaphragm wall as a temporary wallduring excavation and as a permanent wall after completion. There were three steel bracing layers. The maximum depthof excavation of -14.80 m. from ground surface. After excavating to the final depth, there was water seepage observed atpile head during pile head trimming at cut-off level of more than 85%. This phenomenon is rarely seen as for as the authorsconcern. There are several possible causes; for example, percentage of fly ash mixture together with high water head. Tominimize the possible long-term durability, PU form grouting shall be conducted to stop the water seepage before castingmat foundation.
机译:本文介绍了在深层地下室建设期间通过深孔桩渗漏的案例报告曼谷高层酒店项目。施工的自下而上方法与隔膜墙一起使用作为临时墙在挖掘过程中和完成后作为永久墙。有三层钢板。最大深度挖掘-14.80米。从地面。在挖掘到最终深度后,观察到渗水渗水桩头在桩头剪裁期间,在截止水平超过85%。这种现象很少被视为作为作者的忧虑。有几种可能的原因;例如,粉煤灰混合物的百分比与高水头。到最小化可能的长期耐久性,PU形式灌浆应进行,以在铸造之前停止水渗漏垫基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号