首页> 外文会议>International Multi-Conference on Engineering, Computer and Information Sciences >Optimization problem of equipment age structure in the model of Russia's unified energy system development
【24h】

Optimization problem of equipment age structure in the model of Russia's unified energy system development

机译:俄罗斯统一能源系统发展模式中设备年龄结构的优化问题

获取原文
获取外文期刊封面目录资料

摘要

This paper addresses the problem of analyzing long-term strategies for commissioning of generating and dismantling capacities of electric power systems described by means of the nonclassical Volterra equation of the first kind. The paper offers a review of mathematical models designed for calculating forecast values of the input capacities of electric power systems for various strategies of the generating equipment dismantling. We study the vector model that takes into account three types of generating. A new integral model accounts for division of the generating equipment into certain age groups with various technical and economic functioning parameters described the capacity aging processes. We also consider a search problem for the optimal generating equipment lifetime for a given demand for electricity and minimum total costs of commissioning and operating the capacities. We build a forecast for commissioning of generating capacities for various power consumption scenarios and economic indices. Numerical solution to the optimization problem of the generating equipment dismantling time is given. All calculations have been made as applied to the Russia's Unified Energy System.
机译:本文介绍了分析通过第一类非分类Volterra等式描述的电力系统的产生和拆除能力的长期策略的问题。本文提供了对数学模型的综述,用于计算电力系统输入容量的预测值,以获得各种策略的发电设备拆卸。我们研究了考虑到三种类型的传染媒介模型。具有各种技术和经济功能参数的一定年龄组的发电设备将发电设备分开的新的积分模型描述了容量老化过程。对于给定的电力需求和调试和操作能力的最低总成本,我们还考虑了最佳发电设备寿命的搜索问题。我们建立了对各种电力消费情景和经济指标产生能力的预测。给出了发电设备拆卸时间的优化问题的数值解决方案。所有计算都已适用于俄罗斯统一能源系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号