首页> 外文会议>2017 International Multi-Conference on Engineering, Computer and Information Sciences >Optimization problem of equipment age structure in the model of Russia's unified energy system development
【24h】

Optimization problem of equipment age structure in the model of Russia's unified energy system development

机译:俄罗斯统一能源体系发展模式下装备年龄结构优化问题

获取原文
获取原文并翻译 | 示例

摘要

This paper addresses the problem of analyzing long-term strategies for commissioning of generating and dismantling capacities of electric power systems described by means of the nonclassical Volterra equation of the first kind. The paper offers a review of mathematical models designed for calculating forecast values of the input capacities of electric power systems for various strategies of the generating equipment dismantling. We study the vector model that takes into account three types of generating. A new integral model accounts for division of the generating equipment into certain age groups with various technical and economic functioning parameters described the capacity aging processes. We also consider a search problem for the optimal generating equipment lifetime for a given demand for electricity and minimum total costs of commissioning and operating the capacities. We build a forecast for commissioning of generating capacities for various power consumption scenarios and economic indices. Numerical solution to the optimization problem of the generating equipment dismantling time is given. All calculations have been made as applied to the Russia's Unified Energy System.
机译:本文解决了分析长期电力系统发电和拆除能力策略的问题,该策略通过第一类非经典Volterra方程描述。本文概述了数学模型,这些数学模型旨在为发电设备拆除的各种策略计算电力系统输入容量的预测值。我们研究了考虑三种类型的生成的矢量模型。一个新的积分模型将发电设备划分为某些年龄组,并使用各种技术和经济功能参数描述了容量老化过程。对于给定的电力需求以及最小的调试和运行总成本,我们还考虑了最佳发电设备寿命的搜索问题。我们针对各种能耗情况和经济指标建立了发电量调试的预测。给出了发电设备拆除时间优化问题的数值解。所有计算均已应用于俄罗斯的统一能源系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号