首页> 外文会议>International Symposium on River Sedimentation >EXPERIMENTAL STUDY ON DESIGN OF SEDIMENT SETTLING BASINS
【24h】

EXPERIMENTAL STUDY ON DESIGN OF SEDIMENT SETTLING BASINS

机译:沉积物沉降盆地设计的实验研究

获取原文

摘要

In the design of sediment settling basins for irrigation, it is important to determine the basin length. According to normal methods, the design length of a settling basin used to deposit sediment is very long. In this paper, some measures are suggested to decrease the length of a basin by the aid of sediment physical model experiment on the settling basin of Pokhara Irrigation Project in the Kingdom of Nepal. From the experimental results, the basic principles for design of sediment settling basin are presented and two methods are suggested. The first is to extend the storage capacity of skimming zone and prolong the length of weir adequately to reduce the overflow depth. The second is to open the sluice gate partially to release a part of heavily loaded current in the lower layer in settling period. Then, an optimum measure to increase the settling efficiency and prolong the operation period of a sediment basin is recommended. Though the measures are obtained from a specific project, the same techniques could be applied to solve other sedimentation problems in settling basin engineering.
机译:在灌溉沉积物沉淀盆设计中,确定盆地长度是重要的。根据正常方法,用于沉积沉积物的沉降盆地的设计长度很长。在本文中,建议通过尼泊尔王国扑克拉灌溉工程的沉积物体育模型试验借助沉积物体育模型试验来减少盆地的长度。从实验结果中,提出了沉积物沉积盆地设计的基本原理,并提出了两种方法。首先是延长略微扫描区的存储容量,并充分延长堰的长度以减少溢出深度。第二是打开闸门栅极部分以释放在稳定时段中的下层中的重载电流的一部分。然后,建议使用最佳措施来增加沉降效率和延长沉积物盆地的操作周期。虽然从特定项目获得了措施,但可以应用相同的技术来解决解决盆地工程中的其他沉降问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号