PRELIMINARY STUDY OF THE RIVER BED REGULATION IN THE PROCESS OF THE CONSTRUCTION OF THE YANGTZE ESTUARY DEEPWATER CHANNEL PROJECT

机译:长江河口深水渠道项目建设过程中河床规例的初步研究

获取原文

摘要

By analyzing the topographical features of the south channel, the bifurcation section, the south passage, and the north passage, and investigates on the riverbed regulation during the course of the construction of the Yangtze Estuary deepwater channel project are presented in this paper. There are large quantities of bed load sediment moving from upstream to the south channel. These bed load sediment is mainly relevant to two flood of Yangtze River taken placed in 1998 and 1999. The sediment in the South channel often goes downstream, and the entry of the South Passage will inevitably be in deposition if scour occurs in the South channel, which indicates that the South Passage is the main access of bed load sediment in the Yangtze Estuary. During the course of the deepwater channel regulation, the ebb flow ration of the North Passage will decrease whereas the ebb flow ration of the South Passage will increase because the regulation structures give rise to the resistance of the flow in the North Passage. And there occurs scour in the entry of the South Passage and deposition in the upper section of the North Passage. The flow momentum in the spur-dike section will increase and the topography will be washed out dramatically after the spur-dike project, which indicate the spur dike begin to play an important role in water diversion, sand retaining and deposition reduction. The topography transform in the lower section of the South Passage depends on the transform in the upper section of the South Passage. The lower section is subjected to deposition if there is a scour in the upper section. The balances of scour and deposition in the spur-dike section and middle section of the North Passage are maintained in May 2001, and the riverbed regulation came to be stable. The flow ration of north passage must be controlled to guarantee that it will not continuously be reduced so severe that the beyond retrieve change will occur between south passage and north passage during the second stage of Yangtze estuary deepwater channel regulation project.
机译:通过分析南沟道的地形特征,分叉部分,南方通道和北段,并在本文提出了长江河口深水渠道项目建设过程中的河床监管。大量床荷载沉积物从上游移动到南风。这些床载沉积物主要与1998年和1999年拍摄的两洪水洪水相关。南沟道中的沉积物经常下游,如果南京峡湾发生冲刷,南方通道的入口将不可避免地沉积,这表明南方通道是长江口床荷兰沉积物的主要通道。在深水渠道调节过程中,北方通道的退出流量将降低,而南方通道的冰布流量会增加,因为调节结构引起北路流动的流动阻力。在南部通道的上部进入南方通道和沉积时发生冲刷。旋转频道部分的流动动力将增加,在跳水项目之后将急剧清洗地形,表明堤防堤防开始在分流,砂保留和沉积减少中发挥重要作用。南方通道下部的地形变换取决于南部通道的上部的变换。如果上部存在刷子,则下部沉积沉积。在2001年5月,北段的正浴部和中间部分的冲刷和沉积的平衡保持,河床规则稳定。必须控制北段的流量,以保证,在长江河口深水渠道调节项目的第二阶段,南通道与北通道之间将不会连续减少。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号