首页> 外文会议>International Conference on Applied Mathematics, Simulation and Modelling >Resource Constrained Project Scheduling Using Particle Swarm Optimization
【24h】

Resource Constrained Project Scheduling Using Particle Swarm Optimization

机译:使用粒子群优化资源约束项目调度

获取原文

摘要

Project scheduling is the significant technique to attain the lean management, and applications can be found in such fields as construction engineering, equipment support, software development, etc. An activity-on-arrow (AOA) version of the resource constrained project scheduling problem (RCPSP) with the objective of minimizing project duration, derived from the decision making of the equipment support task, is formulated as a combination optimization problem and solved using the priority-based particle swarm optimization (PSO). The activity priorities are represented by particle positions and a serial scheduling scheme (SSS) is utilized to transform particle-represented priorities to an active schedule according to the precedence and resource constraints so that the project duration corresponding to each particle can be evaluated. The framework of the PSO scheme for the RCPSB is developed. Simulation is provided so as to investigate the performance of the priority-based PSO approach for the RCPSB. The optimal solution to a benchmark instance is obtained and compared to that of genetic algorithm, consistency between them showing the effectiveness and efficiency of the particle swarm optimization method.
机译:项目调度是实现精益管理的重要技术,并且可以在建筑工程,设备支持,软件开发等领域中找到应用程序。箭头活动(AOA)版本的资源受限项目调度问题( RCPSP)目的是,从设备支持任务的决策中导出的项目持续时间最小化,被制定为组合优化问题,并使用优先级的粒子群优化(PSO)解决。活动优先级由粒子位置表示,并且串行调度方案(SSS)用于根据优先和资源约束将粒子表示的优先级转换为活动计划,以便可以评估对应于每个粒子的项目持续时间。开发了RCPSB的PSO方案的框架。提供了模拟,以研究RCPSB的优先级的PSO方法的性能。获得基准实例的最佳解决方案,并与遗传算法的最佳解决方案,它们之间的一致性显示粒子群优化方法的有效性和效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号