Highway project performance evaluation: A study

机译:公路项目绩效评估:一项研究

获取原文

摘要

Highway projects are the primary Indonesian issue as a development target in The Medium Term Development Plan. Earned Value Management (EVM), a project control technique which provides a quantitative measure of project performance needed to assurance the target. To evaluate work progress in order to identify schedule slippage and areas of budget overruns used the earned value technique as a proven method. It is involves a crediting (earning) of budget as scheduled work is performed. Budgeted cost of work performed is compared against budgeted cost of work scheduled to assess schedule variances, respectively. The selected site for case study is located in Yogyakarta and found that the project has average schedule variance of 2,53 in 2013, 3,09 in 2014 and 4,40 in 2015 that means the project is ahead of schedule. A SPI of 1,16 in 2013, 1,11 in 2014 and 1,23 in 2015 would tell that the project is progressing ahead of the rate originally planned.
机译:公路项目是主要印度尼西亚问题作为中期发展计划的发展目标。赚取的价值管理(EVM),一个项目控制技术,提供了保证目标所需的项目性能的定量衡量标准。为了评估工作进展,以识别日程分量和预算范围,超支使用赚取的价值技术作为经过验证的方法。这涉及按计划工作的预算贷记(收入)。进行预算的工作成本,与预算的工作成本进行比较,分别预定评估计划差异。案例研究的所选网站位于日惹,发现该项目于2013年的平均进度方差为2,53,2014年3,09及2015年4,40意味着该项目提前提前。 2014年的1,16号SPI,2014年1,111和2015年的1,23人将判断该项目在最初计划的利率之前正在进步。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号