首页> 外文会议>International Conference on Advances in Mechanical Engineering and Industrial >Numerical simulation of the transport diffusion of suspended sediment during the construction of artificial island in Taozi Bay of Yantai
【24h】

Numerical simulation of the transport diffusion of suspended sediment during the construction of artificial island in Taozi Bay of Yantai

机译:烟台桃子湾人工岛施工过程中悬浮沉积物运输扩散的数值模拟

获取原文

摘要

Suspended matter in the sea increases rapidly as a result of the reclamation project during the construction period, which in turn influences the marine ecosystem. Therefore, the study on the transport diffusion of suspended matter in reclamation projects provides an important reference for regional environmental quality assessment and comprehensive ecological impact assessment. This paper takes artificial island reclamation project in Taozi Bay of Yantai as an example, based on the two-dimensional tidal current field mathematical model of engineering waters, the dispersion scope of suspended sediment caused by reclamation overflow during construction of artificial island is predicted by two-dimensional suspended load mathematical model and the accurate simulation of the dispersion of suspended sediment during construction is explored usefully. The results show that the transport and dispersion of suspended sediment produced during construction of artificial island are closely related to the tidal movement and the tide direction and hydrodynamic intensity determine the transport and dispersion direction and range of suspended sediment to a certain degree. During reclamation construction of artificial island, the sediment dispersion during reclamation construction will not affect the Golden Beach as the discharge concentration at the overflow port is low and the envelope range of sediment dispersion is small. Generally, the influence of suspended sediment on the marine environment during construction is just temporary and disappears with the completion of construction, then the suspended sediment will not impose long-term adverse influences on the marine environment.
机译:由于施工期间的回收项目,海上悬浮物在施工期间迅速增加,这反过来影响海洋生态系统。因此,对填海项目中悬浮物的运输扩散的研究为区域环境质量评估和综合生态影响评估提供了重要参考。本文以烟台桃子湾的人工岛填海工程为例,基于工程水域的二维潮流现场数学模型,两次预测人工岛施工期间循环沉积物的分散范围 - 探讨了探索了施工期间悬浮沉积物分散的数学模型和精确模拟。结果表明,人工岛建造期间产生的悬浮沉积物的运输和分散与潮汐运动密切相关,潮汐方向和流动力学强度决定了悬浮沉积物的运输和分散方向和一定程度的沉积物。在人工岛的回收建筑过程中,随着溢流口处的放电浓度低,沉积物分散的外壳范围小,在填海岛的沉积物分散时不会影响金色海滩。一般来说,在施工过程中悬浮沉积物对海洋环境的影响只是临时的并且随着建设的完成而消失,然后悬浮沉积物不会对海洋环境施加长期不利影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号