Design of marine cable installation for ocean current power plant in Toyopakeh Strait-Bali

机译:波特海岸海洋电流电厂海洋电缆安装设计

获取原文

摘要

Toyopakeh Strait is located near Nusa Penida Island in the Province of Bali. Practical potential energy of ocean currents at that location is up to 320 MW. Tidal amplitude reaches more than 2.6 meters and ocean currents reach 3.40 m/s during the full moon, with the time duration is between 10-14 hours per day. This research is part of an ocean currents power plant technical study with a purpose to design of the subsea cable installation from plant to land. The method is determining the dimensions of the cable, dimensions of the pipe protector, stability analysis, and cable laying analysis. With the power of 3 kW, and the distance to the land is 280 m, conductor dimensions required is 3×2.5 m2with 13 mm diameter of cable, while the pipe protector cable thickness is 2.77mm. Vertical stability protector pipe are 0.824 and the lateral stability are 0.373. From the results of these calculations can be assured that the pipes and cables meet the standards of stability.
机译:丰田海峡位于巴厘岛省的Nusa Penida岛附近。该位置的海洋电流的实用势能高达320兆瓦。潮汐幅度达到超过2.6米,在满月期间,海洋电流达到3.40米/秒,持续时间为每天10-14小时。该研究是海流电厂技术研究的一部分,目的是设计从植物到陆地的海底电缆安装。该方法正在确定电缆的尺寸,管道保护器的尺寸,稳定性分析和电缆铺设分析。凭借3千瓦的力量,与土地的距离为280米,所需的导体尺寸为3×2.5米 2 电缆直径13毫米,而管道保护器电缆厚度为2.77mm。垂直稳定性保护器管是0.824,横向稳定性为0.373。从这些计算结果可以放心,管道和电缆符合稳定标准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号