首页> 外文会议>日本建築学会学術講演会 >The Development Process of Counterpart Assistance Refl ected on Multi-stakeholder Interaction in Wenchuan, Yushu and Lushan Earthquake
【24h】

The Development Process of Counterpart Assistance Refl ected on Multi-stakeholder Interaction in Wenchuan, Yushu and Lushan Earthquake

机译:对手援助的发展过程反对汶川,玉树,庐山地震的多利益攸关方互动

获取原文

摘要

1. The implementation of counterpart assistance did not stay invariable but kept developing. During these 3 earthquakes, the rights and obligations of local government gradually strengthened, while the extent of counterpart assistance weakened; reconstruction subject is turning more and more compact. However, as the external assistance and driving force by administrative difference receded, the insuffi ciency of reconstruction lead by local government gradually appeared, indicating that china still have long way to go to establish a scientifi c reconstruction mechanism.
机译:1.对应援助的实施并没有保持不变,但不断发展。在这3个地震期间,地方政府的权利和义务逐步加强,而对同行援助的程度削弱;重建主题越来越紧凑。然而,随着行政差异的外部援助和动力,当地政府逐步出现重建的缺陷效率,表明中国仍然有长路去建立一个科学的重建机制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号