首页> 外文会议>Conference on Computer, Intelligent Computing and Education Technology >The key installation technology of Shanghai Laohutai pumping station facilities transformation
【24h】

The key installation technology of Shanghai Laohutai pumping station facilities transformation

机译:上海拉霍泰泵站设施改造的关键安装技术

获取原文

摘要

Laohutai pumping station is located in the Yan Chang Zhong Lu and Peng Yue Pu junction, covers an area of 1339 m2,the effluent discharged into the Peng Yue Pu pumping station pump flow 9.2 m3/s,planning of size 9.16 m3/s. The pumping station facilities need to complete the technical transformation and upgrading, key technology of corresponding include the installation of a system of mechanical equipment and electrical installation, the sub-divisional work includes replacement of press, grille decontamination machine, screw conveying squeezing machine, stainless steel floating box door and deodorizing equipment and installation of SCB10-800-10/0.4 type energy saving dry type transformer and high and low pressure switch cabinet equipment. Application of the key technology has solved the quality problems of Laohutai pump installation.
机译:拉霍泰泵站位于延长中禄和彭悦浦交界处,占地面积1339平方米,排出矿点进入彭悦浦泵站泵流量9.2 m3 / s,规划尺寸9.16 m3 / s。泵站设施需要完成技术改造和升级,关键技术包括安装机械设备和电气安装系统,分部工作包括更换压力机,格栅净化机,螺杆输送挤压机,不锈钢钢浮箱门和除臭设备和安装SCB10-800-10 / 0.4型节能干式变压器和高压开关柜设备。关键技术的应用解决了拉霍泰泵安装的质量问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号