首页> 外文会议>IEEE Grenoble Power Tech >Optimal operation of HVDC links embedded in an AC network
【24h】

Optimal operation of HVDC links embedded in an AC network

机译:AC网络中嵌入HVDC链路的最佳操作

获取原文

摘要

Electrical grid development is necessary, in order to ease the whole electricity market, to enhance the security of power systems and to facilitate the integration of renewable energies. HVDC technology is one possible response that is considered by many TSOs. A new challenge consists today in handling the operation of such HVDC links integrated in an already meshed AC network. This paper presents a possible solution for an optimal operation of such HVDC links in steady state. The power set point is chosen thanks to an optimization tool that coordinates all HVDC links and phase-shifter transformers (PST) in a widespread area. Then, for each HVDC link, an automatic device adapts the power set point in few minutes to solve, if any, overloads on close lines. Preventive and curative actions enabled by HVDC technology are used to improve the performance of the network.
机译:电网开发是必要的,为了缓解整个电力市场,提高电力系统的安全性,并促进可再生能源的整合。 HVDC技术是许多TSO所考虑的一个可能的响应。今天,新的挑战在于处理在已经网状交流网络中集成的这种HVDC链路的操作。本文介绍了在稳态处于稳定状态的这种HVDC链路的最佳操作的可能解决方案。由于优化工具,选择了电力设定点,该优化工具在广泛的区域中协调所有HVDC链路和移相器变压器(PST)。然后,对于每个HVDC链路,自动设备在几分钟内适应电源设定点,以便在关闭线上求解。 HVDC技术启用的预防性和策利动作用于提高网络的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号