首页> 外文会议>2013 IEEE Grenoble Power Tech >Optimal operation of HVDC links embedded in an AC network
【24h】

Optimal operation of HVDC links embedded in an AC network

机译:嵌入交流网络的HVDC链路的最佳运行

获取原文
获取原文并翻译 | 示例

摘要

Electrical grid development is necessary, in order to ease the whole electricity market, to enhance the security of power systems and to facilitate the integration of renewable energies. HVDC technology is one possible response that is considered by many TSOs. A new challenge consists today in handling the operation of such HVDC links integrated in an already meshed AC network. This paper presents a possible solution for an optimal operation of such HVDC links in steady state. The power set point is chosen thanks to an optimization tool that coordinates all HVDC links and phase-shifter transformers (PST) in a widespread area. Then, for each HVDC link, an automatic device adapts the power set point in few minutes to solve, if any, overloads on close lines. Preventive and curative actions enabled by HVDC technology are used to improve the performance of the network.
机译:为了缓解整个电力市场,增强电力系统的安全性和促进可再生能源的整合,必须发展电网。 HVDC技术是许多TSO考虑的一种可能的响应。今天,新的挑战在于处理集成在已经网格化的交流网络中的此类HVDC链路的运行。本文提出了在稳态下优化此类HVDC链路的可能解决方案。借助优化工具可以选择功率设定点,该工具可以协调广泛区域中的所有HVDC链路和移相变压器(PST)。然后,对于每条HVDC链路,自动设备都会在几分钟内调整功率设定点,以解决闭合线路上的过载(如果有)。 HVDC技术支持的预防和治疗措施可用于改善网络性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号